Industrial Projects

Davidson River Bridge

100’ long Bridge over Davidson River at Daniels Ridge trail head. Constructed from weathering steel to replace the old bridge washed away by Hurricane Ivan. ... Read More »

Smoke Stack Demolition

Demolition of a smoke stack at East Henderson High school had to be performed over a week end with minimal disruption.  A special frame was fabricated to allow sawing the brick and liner into sections and lowering onto a trailer to be demolished off site. ... Read More »

Penthouse Tower

This 53’ high equipment penthouse tower was constructed on the ground including installation of electrical and bridge cranes.  It was then hoisted into place in 3 sections. Columns penetrated existing roof and set on special foundations.  After sheeting front section and flashing new structure to ... Read More »